Wanship Fiber/Conduit installation 2018-12-14T15:26:48+00:00

Project Description

Project: Wanship Fiber/Conduit installation

Customer: Beehive Telecom

Location: Wanship, UT

Americom utility crews installed 10,650 feet of (1) 2” conduit using both spider plow and directional drilling construction methods.  Americom then installed a 48-strand fiber optic cable through the new conduit structure connecting the new cable to communication towers.

Americom also excavated and set (5) 24”X36” utility vaults.