Southern Utah University Science Building 2018-08-24T15:03:15+00:00

Project Description

SUU Science Building Tech Refresh

What: Re-cable of the Science building to bring it up to current technology. Installed 85,000 feet of category 6A cable.

Role: Americom acted as design consultant, engineer and installation team. It was  Design/Build project.

Difficulty: This was an existing facility with very difficult pathways due to the age of the building. The installation time had to fit in a very tight schedule to keep the users groups functioning through the course of the project. There was a great deal of coordination and scheduling needed.

Delivery: Project was a cost plus contract type. Americom finished ahead of schedule and underbudget.