Power conduit and utility box installation, Herriman, UT 2018-12-14T15:30:57+00:00

Project Description

Client: Rocky Mountain Power

General Contractor: Sturgeon Electric

Location: Herriman, UT

Scope of work: Americom Technology performed trenching and directional drilling while placing 6,165 feet of (1) 6” underground power conduit and placed (8) 7X12 underground concrete utility boxes. This project included the teamwork of our Directional Drilling crews, excavation teams and our underground utility unit to complete this job on time and on budget with safety at the forefront.