Scope of work: Directionally Drilled 400’ 16” steel casing under I-15 and placed a 10” carrier pipe inside the casing, Americom was also responsible for digging the bore pits as well as welding the steel casing.

 

• Client: Geneva Rock

• Time-line: June 2017 – July 2017 – 15 days

• Equipment Used: DitchWitch JT-3020

• Distance: 400 feet

• Location: I-15, Lehi Main Street, Lehi, UT

• Client Issue: Client needed to install a 16” pipe under I-15, trenching was not an option.

• Americom Solution: Directionally Drilled the pipe under I-15 with almost no traffic impacts.

 