Project Description
Scope of work: Performed a 900’ / 8” sewer line bore for new construction site on budget and on time.
Client: Stan Miller
Time-line: 16 days
Equipment Used: JT100 Ditch Witch directional drill
Distance: 900’
Location: Breckenridge, CO
Client Issue: Client needed a sewer line for new construction in mountain area.
Americom Solution: Americom used it’s large JT100 directional drill to bore in at a 1% grade with 8” pipe for a distance of 900’.