Flare Construction 4″ and 6″ Gas Line – 2018-05-17T13:14:09+00:00

Project Description

Scope of work: Americom used one of it’s Ditchwitch JT30 All Terrain directiolnal drills to complete over 780 feet of directional boring under roadways and placement of 4” and 6” gas pipelines.

Client Issue: Old pipe needed to be replaced by newer, up to code IHP pipe.

Americom Solution: Americom removed the outdated gas lines and replaced them with both 4” and 6” new IHP piping.

• 4” and 6” Gas pipeline installation

• 782 feet of directional drilling 

• Minimal traffic disruption 

• Zero utility disruptions, safety, or hazard issues 