Client name: Canyons Construction

Location: Elko, Nevada

Project name: New Mont Gold Mine Area 5 & 6 new pond

How many feet of pipe: 24″ pipe DR 7 – 9,000 feet welded, 16,000 ft of 18” DR 11 & 4,000 ft of 20” DR 11

Pipeline used for: Water utility

This 24″ pipe with a cool pack is used to help weld the pipe faster. An 18″ and a 20″ pipe was then welded with our fast fusion machine technology.