Project Name: Vineyard 22,500’ Fiber Installation

General Contractor: Whitaker Construction

Customer: Central Utah Water Conservancy District

Location: Vineyard, UT

Project detail: Americom performed conduit proofing of 15,000’ of (4) 6”, installation of 20,000’ of (1) 48ct and 2,500’ of (1) 6ct Fiber Optic Cable for the Central Utah Water Conservancy District.

VERIZON WIRELESS CALL CENTER

2019-07-02T06:20:00+00:00

Project Name: Verizon Wireless

General Contractor: HITT Construction

Location: Salt Lake City, Utah

Scope of work: Americom provided the technology infrastructure for facility

Project Details: Americom provided products, materials and installation for structured cabling, fiber optic solutions, WAP, and horizontal cabling throughout the 2-phase project. Over 1450 cables were installed in a high profile, fast turnaround project. Panduit, Nflexon, and RXL products were […]

UNIVERSITY OF UTAH SUPPORT SERVICES CENTER

2019-06-28T16:43:18+00:00

 

Project Name: University of Utah Support Services Center

Electrical Contractor: JT Electric

Location: South Jordan, Utah

Scope of work: Americom provided the technology infrastructure for University of Utah call center.

Project Details: Americom provided a design build for data, AV, sound masking, time clocks and white noise throughout the building. Over 1400 cables installed in a high profile fast track project. Commscope, Corning and […]

UTAH VALLEY UNIVERSITY PERFORMING ARTS CENTER

2019-05-01T15:22:02+00:00

Project Name: Utah Valley University Performing Arts Center

Electrical Contractor: Wasatch Electric

Location: Orem, Utah

Scope of work: Americom provided the technology infrastructure for the communication network including cabling, patch cords, wall jacks, racks, backbone distribution, using Panduit, Corning, Siemon, and CPI specified products and materials.

Utah Department of Environmental Quality Tech Support Center

2019-05-01T15:21:25+00:00

Project: DEQ Building

Client: State of Utah Department of Environmental Quality

Location: Salt Lake City, UT

Scope of work: Americom performed the installation and testing of information technology cabling services for The State of Utah’s new state-of-the-art Tech Support Center.

Americom utilized Systimax, Commscope, Corning, and CPI products with Cat6 and Cat6A structured cabling to complete this project on […]

PROJECT: Tallgrass Iron Horse pipeline

2019-03-26T13:18:12+00:00

 

PROJECT: Tallgrass Iron Horse pipeline

CUSTOMER: Jomax Pipeline Construction

LOCATION: I-25 Douglas, Wyoming

PROJECT INFO: Americom Technology inc. was contracted through Jomax Pipeline Construction to complete work on the Iron Horse pipeline project installing over 9,000 ft of 16” gas pipe and 1.25” communications pipe. (Including drill shots of 2500’ and 3,500’ in length.)

Meritage Midstream pipeline

2019-03-26T13:17:48+00:00

Customer: Jomax Construction

Location: Douglas, Wyoming

Project Specifications: Americom Technology inc. was contracted through Jomax Pipeline Construction on the Midstream pipeline project with Meritage Midstream to install over 4,000 ft of 20” gas pipeline.  Americom is currently running (2) 100,000 lb drills to complete the ongoing project.

 

Southern Utah University Geo Science center Remodel

2019-02-21T15:24:18+00:00
Project Name: Southern Utah University Geo Science center Remodel
General Contractor: Layton
Electrical Contractor: Marshal & Evans Electric Inc.
Location: Cedar City, Utah
Scope of work: Install the category 6A technology infrastructure for a total building remodel from Administration offices to a Geo Science center.