4th District Court – Provo UT

2018-10-29T13:37:06+00:00

Americom installed a Commscope category’s 6A and Fiber optic solution for the 4thDistrict Court facility. The Americom and Commscope team have been “the right choice” for The State of Utah Court for more than 20 years. Americom also assisted our A/V partner to install the A/V systems for the […]

Southern Utah University Science Building

2018-08-24T15:03:15+00:00

SUU Science Building Tech Refresh

What: Re-cable of the Science building to bring it up to current technology. Installed 85,000 feet of category 6A cable.

Role: Americom acted as design consultant, engineer and installation team. It was  Design/Build project.

Difficulty: This was an existing facility with very difficult pathways due to the age of the building. The installation […]

DIXIE STATE UNIVERSITY ST. GEORGE, UT

2018-05-30T13:54:51+00:00

Scope of work: Provided design assist services to plan pathway and capacity for the system. Managed the installation termination, splicing and testing of the new single mode fiber optic system.

Cable Systems Installed: Single mode campus wide fiber optic ring

Client Issue: Dixie state seeded someon to help specify and install a new fiber optic backbone ring for their […]

Ashley Regional Medical

2018-05-30T13:42:07+00:00

Provided the owner with a consultative approach to meeting their needs. Installed a high quality technology infrastructure that services all of the communication technology needs. Installed a 20 year warrantied system containing; Catagory 6 cable, coaxial cable, fiber optic cable, and A/V devices

Catagory 6, Fiber Optic, Nurse call, Public address, Security cameras, AV SYstems, Wireless […]

Dixie Applied Technology College – St. George, UT

2018-08-23T01:20:03+00:00

Client: Dixie Applied Technology College

Time-line: May 2017- Sept 2017

Location: St. George, UT

Client Issue: Client needed a high end cable infrastructure to support network, wireless access points, and other communication needs. New buildings being built as part of the ATC system in Utah.

Americom Solution: Provide the owner with a consultative approach to meeting their needs. Installed a high quality technology infrastructure […]

Iron County School District – Cedar City, UT

2018-08-23T01:57:48+00:00

Client: Iron County School District

Location: Cedar City, UT

Client Issue: Needed a new cable infrastructure to support a new security camera system in existing schools. Work needed to be done while school was

Americom Solution: Coordinated with various school administrators to get access to needed areas without disrupting the students or staff. Coordinated with district officials on security […]

Wells Fargo Bank – Salt lake City, UT

2018-06-19T15:19:07+00:00

Scope of work: Category 6A, Fiber Optic

Client: Wells Fargo Bank

Time-line: December 2017 – January 2018

Location: Salt lake City, UT

Client Issue: Corporate expansion of and exiting building. Very tight time frame and coordination to install Category 6A cable in a high density modular furniture environment. Station cable needed to be routed between floors.

Americom Solution: Provided coordination services and professional installation services […]

Rocky Vista University – Ivins, UT

2019-03-12T15:02:54+00:00

Scope of work: Catagory 6A, Fiber Optic, Nurse call, Public address, Security cameras, Access control, AV Systems, Wireless access points, Distance learning

Time-line: December 2016 – June 2017

Location: Ivins, UT

Client Issue: New Medical School built as a sister campus to an existing campus in Colorado

Americom Solution: Provided design assist services for a high end technology infrastructure. Provided all material and […]

Ernest Health Care Systems – Flagstaff, AZ

2018-09-06T23:26:35+00:00

Client: Ernest Health Care Systems

Time-line: December 2017 – February 2018

Client Issue: New hospital being built as part of a national hospital system. All communication and technology systems

Americom Solution: Provide the owner with a consultative approach to meeting their needs. Installed a high quality technology infrastructure that services all of the communication technology needs. Provided coordination services on […]

Weber State University – Tracy Hall Science Center – Ogden, UT

2018-06-19T15:24:21+00:00

Scope of work: Voice, data, fiber backbone and copper backbone was installed in new 174,000 square foot building. 559,000’ of Systimax CAT6A cabling, fiber riser backbone cabling, copper campus backbone cabling, fiber campus backbone cabling, communication equipment room fittings, AV cabling, copper campus backbone, fiber riser backbone cabling, copper riser backbone cabling, and communications horizontal cabling.

Client: Weber […]

Load More Posts